Roof Replacement Types for Pompano Beach Homes

Tear-off and re-roof in the same material
Most replacements here keep the material the house already has. The HVHZ reroofing section of the Florida Building Code allows one narrow shortcut: asphalt shingles may go over a single existing layer of shingles when the old surface varies by no more than 1/8 inch. Old tile, slate, metal shingles and wood shakes can never be covered over, though. And no new roof can go over sheathing that is soaked, rotted or not fastened to code. In practice, most quotes are for a full tear-off, because nobody can see the deck until the old roof is off.

Switching materials (shingle to metal or tile)
Changing material changes the paperwork and sometimes the framing. Every roofing component in the HVHZ needs a current product approval. The city's permit form asks for the approval's front page and its system description, plus different form sections for each material: tile uses one more than shingles or metal. Check the exact product on the state's Florida Product Approval search or its Miami-Dade Notice of Acceptance before you sign. Slope matters too. Nailed tile and metal shingles need at least 4:12, while metal panels and mortar-set tile can go down to 2:12. Tile is also heavy, so a structural engineer (about $100 to $220 an hour in HomeGuide's figures) may need to check the trusses before a shingle house switches to tile. The tile and metal pages cover those systems in depth.

Re-roofing one section or slope
A single slope or wing can count as its own roof section. That helps when one side took the damage and the rest is sound. On roofs permitted before the 2007 code took effect, repairing more than a quarter of a section within 12 months forces the whole section to current code (the 25% rule). Ask how the new section will tie into the old one at the ridge and valleys, and whether the existing material is still made in a matching color.

Homes with pitched and flat sections together
Plenty of houses pair a pitched main roof with a flat porch, Florida room or carport out back. On the city's HVHZ application, low-slope roofing uses sections A, B and C, while shingles, tile and metal use A, B and D. So the quote should list both systems. Under the reroofing code, the contractor must warn the owner up front about any chance of ponding and suggest an engineer's look at the structure if so. Ask whether both areas will be done under one permit and on the same schedule. The flat side has its own choices, covered under flat roof replacement.

Older homes that need deck work first
About 39,400 of the city's 64,308 homes were built between 1950 and 1979, by Census counts, and only about 9,300 date from 2000 or later. Under a roof that old, the deck has usually been through several coverings. The code requires every area of deteriorated sheathing to come out and be replaced. Spaced board sheathing has to be filled in solid or re-sheathed before any roof covering except wood shingles goes back on. Replacement decking runs about $2 to $5 a square foot in cost guides. The permit packet also includes an owner's notice that the deck may need renailing once it is exposed.

Why Pompano Beach homeowners call Pompano Beach Roofers
- Calling or sending the form costs you nothing
- Your request goes to one roofer, not a list of bidders
- Ask for tear-off, deck work and the permit on one itemized quote
- Get the roofer's CC or RC license number and check it yourself
Roof Replacement Permit Paperwork in Pompano Beach
Every re-roof in the city goes through the Building Department. Here is what the file holds and what you should see before work starts:
HVHZ Uniform Permit Application
It is the Florida Building Code 8th Edition (2023) form, and a licensed contractor has to complete and sign it.Product approval pages
The approval's front page and its specific system description, matching the products on the quote.Owner's Notification for Roofing Considerations
This is filed for reroofing only. Read it before you sign: it explains that the deck may need renailing.Roofing Affidavit for Windstorm Loss Mitigation
It certifies that the roof-to-wall connections meet state law and FBC Existing Building 706.8.1. See hurricane roof upgrades for what that can involve.Fees
The $75 roofing minimum or the 2.75% building rate, with 50% of the building fee due at submittal. Work started without a permit can be billed at double the fee.Inspections
One at the underlayment stage, one while the covering is going on, and a final. Tile laid in mortar or adhesive gets a TAS 106 field uplift test ahead of that final.
What Changes a Roof Replacement Price
Roof area, not floor area
Overhangs, pitch and extra hips and valleys all add squares.What comes off
A second shingle layer or concrete tile costs more to strip and haul than one layer of shingles.Deck sheets
These can't be counted until the tear-off. Ask for a per-sheet price in writing so the extra is predictable.The new system
Material choice moves the price more than anything else; the cost table on the homepage compares them side by side.Payment schedule
HomeGuide's advice is not to pay in full upfront. Pay in stages and get a receipt for each payment.
See how a flat-roof tear-off differs if part of your house is low-slope.